The specific operation procedures of high-speed automatic ink-wash printing machine are as follows: pre production operation specification 1. Machine inspection work 1. Carry out the following routine inspection on the machine; (1) check whether there are other items in the unit and on the workbench. (2) Check whether the oil level is normal. (3) Wipe and inspect the plate for damage. (4) Run the machine to check for abnormal noise. (5) Each lubricating point must be filled with oil once. 2. Understand the operation status of the equipment, run the machine to check whether there is abnormal noise. 2、 Production preparation: 1. Check the handover record; 2. After receiving the production order, first check whether the specified order is correct, understand the process requirements, production quantity and precautions of the products to be produced. The movable parts printed in two shifts should be marked on the printing surface, so as to trace the quality problems. 3. Prepare raw and auxiliary materials according to the specified list. 4. Read the product specification sheet carefully to find out whether there are special requirements for the product: (1) whether online glazing is required; (2) whether die cutting and die cutting requirements are required; (3) whether there are requirements for printing color sequence; (4) whether printing or thread touching is needed first; 2. Check the production situation of paperboard to see if it is necessary to print in batches to avoid the occurrence of free defective products; (it is strictly forbidden to sit on the cardboard or press by hand, so as to avoid local depression and affect printing) 3. Set the ink amount and ink viscosity according to the printing color requirements in advance; 4. Correctly adjust the machine pressure, printing speed, slotting position, and reasonably arrange the color sequence. Start feeding, produce one or two pieces of paperboard, pass the inspection, and start batch production. 2. Check the following aspects of the packing box according to the approved draft or the approved sample: (1) the position of the picture and text; (2) the position of the polishing position; (3) the size of the box; (4) whether the picture and text are complete; (3) the following methods are adopted for the examination of the picture and text: (1) the off draft check (separated from the signed draft) read through line by line; avoid the mistakes in the signed draft; (2) check according to the signed draft or sample; 4. During the production process, random inspection should be carried out at any time to check whether there is running position, color difference, whether the pictures and texts are clear and short, whether the slotting knife edge has burr and tear, whether the cover molding has overlapping seam, whether the pressure line is correct and whether the pressure is appropriate. If there are quality problems, they should be handled in time, and the defects should be marked so that they can be detected in the later process. 5. During the loading process, the paperboard staff shall strictly check and control the quality of the paperboard. In case of blistering, bending, dewing, tearing and other defects found, they shall be detected for other use. 6. If the following problems are found, the machine should be shut down immediately for treatment: (1) large color difference and no ink phenomenon; (2) picture and text defect or printing plate problem; (3) printing surface is dirty; (4) machine failure; 7. Observe whether the machine has problems at any time during production and timely guarantee. 8. If the material problems can not be solved on the spot, the production shall be stopped and reported to the quality inspector to let the relevant departments solve them to prepare for the subsequent production. After the end of production operation specification 1. The printed qualified products and the products to be inspected should be placed separately and clearly marked. 2. The captain arranges personnel to clean and maintain the machine according to the "machine maintenance system". 3. Cut off the power supply and air flow.